Peoples Energy (Khimti 2 HEP, 48.8MW)

Khimti II Hydro-electric Project (48.8 MW)developing by Peoples Energy Limitedis in the border of Ramechhap and Dolakha districts State No - 3 of Nepal. The headworks site is located near Rasnalu VDC of Ramechhap district and the powerhouse site is located at Simlep, Hawa VDC of Dolakha. Geographically, the project area is located in between latitudes 27 ̊33’07”-27 ̊35’13” and longitudes 86 ̊09’26”-86 ̊14’18”.The project is accessible from Kathmandu by 198km long road via Jiri or 145km long road via Khurkot-Manthali on BP highway.