Located in Rasuwa district (currently Gosainkunda Rural Municipality), Langtang Khola HEP is the second biggest project undertaken by RM Group, with a generation capacity of 20 MW. The rated head for this project is 195 m with a design discharge of 12 cumecs. The energy output in dry season is 34
Multi Energy Development P. LTD.